Sunday, November 5, 2017

Report #22. River Trail extension cleared today.

The River Trail extension was roughly cleared this spring.  That means that a few remaining leaning trees needed to be removed, brush along the edge cut, then all the little stumps that would flatten tires, needed to be located and trimmed off.
In the previous post, you can see photos of a trench that we need to install a culvert in. Couldn't trailer that in, without prepping the trail as was done this weekend.
Sandy tackled the shoots with the boomerang and whacker.

Arly trimmed stumps and leaners with the chain saw. It's gettin' there!

Rain in the morning and "falling back" to standard time shortened the work day, but we got 'er done!