Work was done today and a culvert was installed on the River Trail Extension that was opened up this spring. There was so much water flowing here, we either had to install corduroy or a culvert or we wouldn't have been able to groom it.
![]() |
| Loaded for work! This is the new Kodiak going into service this year. The UTV is in the shop. |
![]() |
| Here you can see the small trench across the trail that was dug this spring. |
![]() |
| Now the trench is becoming much larger and straight. |
![]() |
| More help arrives! |
![]() |
| We have lunch. |
![]() |
| A certain puppy helped as well. |
![]() |
| Yes we do need, and do hope to get a tractor and backhoe soon. |
![]() |
| A test fitting. This culvert is 20ft long so as to make sure groomers can't fall into wet spots. |
![]() |
| Many adjustments were made to get it right. |
![]() |
| Trail mutt supervision. |
![]() |
| A wet fall it's been. |
![]() |
| This location is normally dry. |
![]() |
| Back fill is being added and tapped down. |
![]() |
| Done!! Big thanks to Dave N and Bob J! This project would not have been done without there help. |