Saturday, November 18, 2017

Culvert report #27

Work was done today and a culvert was installed on the River Trail Extension that was opened up this spring.  There was so much water flowing here, we either had to install corduroy or a culvert or we wouldn't have been able to groom it.
Loaded for work!  This is the new Kodiak going into service this year.  The UTV is in the shop.

Here you can see the small trench across the trail that was dug this spring.

Now the trench is becoming much larger and straight.

More help arrives!

We have lunch.

A certain puppy helped as well.

Yes we do need, and do hope to get a tractor and backhoe soon.

A test fitting.  This culvert is 20ft long so as to make sure groomers can't fall into wet spots.

Many adjustments were made to get it right.

Trail mutt supervision.
 
A wet fall it's been.

This location is normally dry.
Back fill is being added and tapped down. 

Done!!  Big thanks to Dave N and Bob J! 
This project would not have been done without there help.