Today 4 tons of premix concrete was moved from the fairgrounds to the job site in preparation of a pour that job boss Mark says is tentatively scheduled for 9am Friday. We still could use a few more hands and do note, not all jobs require bag lifting. Please get in touch if you can help in any way. Call or text 370-2911 or email arlyn.aronson@gmail.com
1st load arrives! |
The hearty loading crew. We managed to haul 22 bags per trip which weighted in at 1800lbs each. Some claimed we hauled more than that! |
Another load heads down. Special thanks to Emanuel for taking photos today. |
The new trailer paid for itself today in labor savings. |
Vittles will be served on Friday when the mix-n-pour happens. |
Another load is backed in. |
The last load arrives. |
With the gracious help today, this just took 1.5 hours. |
A platform was built to hold the bags at a level slightly above where the mixers will go. These two are covering them from the weather. |